What to Do With a Negative Answer

The five responses available when commitments exceed capacity, which of them are real, and why the default response is the only one that is not.

Closing · Reference

When the subtraction comes out negative there are five possible responses, and only four of them are real. The fifth — absorb it — is the default everywhere and is not a decision, because nobody takes it and nobody can see it being taken.

The reconciliation in “What to Do With a Negative Answer” is strongest when assumptions and current work records can be examined separately. A team considering ways to track work hours for ways to track work hours can add time and project context, with transparent settings, limited access and a clear correction route around consequential decisions.

Naming the five, in writing, is what converts an overcommitment from a condition into a choice.

Teams documenting “What to Do With a Negative Answer” may use US Census Business Dynamics Statistics as an independent reference. Test the approach against actual constraints and accountable decision owners.

The five

Reduce the claims. Increase the capacity. Move the dates. Lower the quality or scope of something. Or absorb the difference, which means somebody works more hours than the plan contains.

Every organisation uses all five. Only the first four can be decided, reviewed or defended.

Reducing the claims

The most direct and the hardest, because it requires somebody to tell a claimant no. It is also the only response that leaves the plan achievable without anything else changing.

The account makes it possible by showing which claims exist, in what state, with what evidence. Cancelling an assumed claim is a conversation; cancelling a confirmed one is a decision at a level above the sponsors.

Increasing the capacity

Hiring, contracting, borrowing from another team, or buying the work outside. All four take longer than the period they are meant to fix, which is the thing most often misunderstood about this option.

Capacity added this quarter helps next quarter at the earliest, and usually the one after. A negative difference in the current period cannot be closed by recruitment, and saying so early prevents a quarter of waiting for it.

Moving the dates

Frequently the cheapest real option and the least considered, because dates feel fixed and capacity feels negotiable, when in most organisations it is the other way round.

A claim moved by six weeks may cost nothing at all. Finding out requires asking the claimant, which is a short conversation that the account makes possible by identifying which claims are competing.

Changing scope or quality

Legitimate, common, and dangerous when it is implicit. Scope reduced by agreement is a decision; scope reduced by whoever is running out of time is an accident with the same arithmetic and none of the consent.

If this is the response, it needs the same visibility as a cancellation, and the claimant has to agree to what they are getting instead.

Absorbing it

What happens when none of the four is chosen. People work longer, the least visible claim suffers, standing work is deprioritised until it becomes an incident, and the organisation learns nothing because no decision was recorded.

It also has a cost that arrives later and elsewhere — in turnover, in quality, in the next period's carry-forward — and it is never attributed to the quarter that caused it.

Presenting the five

Put them on the page beneath the difference, with a number against each where one is available: "this closes by cancelling claim X (468 h), by moving claim Y to Q3 (520 h), or by adding 0.3 FTE from January (will not help this quarter)."

That framing makes the choice concrete and makes the absence of a choice visible, which is its real function.

Who chooses

Whoever can cancel a claim, which is usually one level above the sponsors. Not the planner, not the team, and not the sponsor whose claim is largest.

Escalating to the right level is most of the value of having done the arithmetic, and sending a negative difference to the team is the commonest way to waste it.

The order to try them in

  1. Close anything lapsed, which costs nobody anything.
  2. Move dates, which is usually cheaper than anybody assumes.
  3. Reduce claims, starting with assumed and provisional ones.
  4. Change scope, by agreement and in writing.
  5. Add capacity, knowing it helps a later period.

Four of the five are available this week; the fifth is not. Running them in this order resolves a surprising share of negative differences before anybody has to be told no.

What absorption costs, in the places it shows up

Not in the capacity account, which is why it is invisible there. It shows up in next period's carry-forward, in the support queue, in the quality of the least visible work, and eventually in turnover.

Carrying one line in the account — "difference absorbed, no decision recorded" — at least puts the word in the document, and in most organisations seeing it twice is enough to produce a decision the third time.

Recording the choice

One line: the difference, the response chosen, who chose it, and the date. That line is what the variance analysis will need three months later.

Over a year it also shows which of the five the organisation actually uses, and in most places the honest answer is the fifth, which nobody has ever seen written down.